2019 World's Most Ethical Companies

Natural Gas Pipeline Slide Repair


Natural Gas Pipeline Slide Repair

GeoStabilization was called to repair a landslide threatening the Trans Colorado Pipeline near Mancos, CO. The repair area was in very steep terrain and the repair was completed by tethering a drill from a large Dozer to install the soil nails. Solid bar soil nails were installed to depths up to 20-ft. GeoStabilization then installed high-strength mesh over seeding and jute mat-type material to reestablish vegetation to the repaired slope.


Project Photos


Meet the Team

, Natural Gas Pipeline Slide Repair
Corey Mislinski, Natural Gas Pipeline Slide Repair
Corey Mislinski
P.E., Project Development Engineer, Energy Services

Featured Employees

Chris Ruppen, P.G., Energy Services Director
Chris Ruppen
P.G., Energy Services Director
Brent Leverett, M.S., Northeast Regional Director
Brent Leverett
M.S., Northeast Regional Director
Tannon Hillis, E.I.T., Field Engineer
Tannon Hillis
E.I.T., Field Engineer

Meet Our Entire Team