GeoStabilization International® has transformed bridge construction with GSIBRIDGE™, bridge construction utilizing Geosynthetically Confined Soil™ (GCS™) services* that accelerates construction to a fraction of the time when compared to traditional construction methods. Once the existing superstructure is properly removed, new bridge abutments are constructed on each bank; often well away from the stream below. A prefabricated or constructed in-place bridge superstructure is then affixed to the abutments and the GSIBRIDGE™ is ready for traffic.
This approach saves huge sums of money, reduces fabrication time to a fraction, and avoids lengthy and uncertain permitting. Contact Mike Close, our Bridge Specialist, for more information. Let us show you how GeoStabilization can save you money and time.
*The terms “Geosynthetic Reinforced Soil (GRS)” and “Geosynthetically Confined Soil™ (GCS™) services” can be used interchangeably
**From June 2012 FHWA publication titled: “Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide”
If you are interested in a no-obligation site visit to determine if our services fit your needs, call us at 855-579-0536 or fill out our contact form.