How GSI Delivers Temporary Shoring
Assessment and Planning
Evaluate excavation geometry, surcharge loads, utilities, groundwater, and access constraints.
Engineering and Detailing
Define nail type, lengths, spacing, facing, and drainage to meet performance and durability goals.
Top-Down Installation
Launch or drill nails from the surface; pressure grout as specified. Nails take load immediately, allowing concurrent excavation.
Drainage and Dewatering
Install horizontal drains and weeps to manage inflow and improve stability.
Finish and Turnover
Apply mesh or shotcrete facings, complete verification testing, and provide documentation for closeout.