Soil Nailing in Tarrant County

Soil Nailing in Tarrant County

The same highway expansion driving growth along Tarrant County's I-820 and 183 corridors regularly requires cutting into slopes made of heavy, unpredictable clay, ground that can start moving again if it isn't reinforced correctly the first time. GeoStabilization International designs and installs soil nail walls across Tarrant County to hold those slopes and cut faces in place permanently.

Contact Us
Remote operated soil nail launcher system in field

What Is Soil Nailing?

Soil nailing turns the ground itself into the retaining structure instead of building a separate wall to hold a slope or cut face back. Crews install a grid of near-horizontal grouted steel bars into the face from the top down as excavation proceeds, then finish the surface with shotcrete.

GSI installs soil nails across Tarrant County using our patented Soil Nail Launcher™, which fires a launched nail into the slope at up to 250 miles per hour instead of drilling a conventional borehole. That speed matters on active highway corridors like I-820 and 183, where minimizing lane closure time has real value, and the launcher's independence from a stable open borehole helps in the county's heavy clay growth areas. GSI's Tarrant County soil nail projects typically involve:

  • Stabilizing cut slopes for highway widening along I-820, 183, and connecting corridors
  • Retaining excavation faces for logistics and distribution construction near Alliance Airport
  • Repairing slopes that have already begun moving after heavy rainfall
  • Reinforcing slopes near rail corridors and utility infrastructure
  • Supporting permanent cut faces for growth-corridor development
  • Facing reinforced slopes with shotcrete for a finished, low-maintenance surface
  • Installing nails through heavy clay and variable fill common in southern growth areas

Geohazard Mitigation in Texas

Our Soil Nailing Process

Every Tarrant County site brings its own ground conditions, so we verify them before committing to a design.

Step 1

Comprehensive Site Assessment

We assess the slope's soil type, existing movement, and proximity to active roadway or logistics construction before confirming soil nailing is the right approach.

Step 2

Licensed Engineering Design

Our PE-licensed engineers design nail length, spacing, and grout specifications to the confirmed soil strength and Texas Building Code requirements.

Step 3

Professional Installation

Crews fire SuperNails™ into the face with the Soil Nail Launcher as excavation proceeds top-down, minimizing time near active traffic lanes where applicable.

Step 4

Ongoing Monitoring & Support

We inspect the finished wall and remain available to monitor performance through the county's seasonal clay movement.

Ready to Secure Your Project?

Request Free Estimate

See Our Success Stories

View Project Gallery

Common Questions About Soil Nailing

Launched nails install at up to roughly 250 twenty-foot nails per day, which matters for minimizing lane closures on active highway corridor work.

A soil nail wall typically costs 25 to 50 percent less than an equivalent-height soldier pile wall and becomes a permanent structure. We provide a fixed-cost proposal after reviewing site conditions.

Yes. Every design is stamped by a licensed Professional Engineer and meets applicable Texas Building Code and transportation agency requirements for the project.

Yes. GSI offers 24/7 emergency response and can mobilize quickly to address slope failures affecting roadway or logistics-site construction.

Because SuperNails™ install at up to roughly 250 twenty-foot nails per day, a launched-nail wall completes faster than a conventional drilled system, reducing the time lanes or shoulders stay closed.

We evaluate soil strength, existing movement, and site-specific clay conditions before finalizing nail length and spacing rather than applying a single county-wide assumption.

The launcher unit is mounted on a compact excavator base, letting crews work efficiently in active industrial or logistics environments with minimal footprint.

Yes. Because launched SuperNails™ don't depend on an open borehole, they install effectively in variable or loosely compacted fill common in rapidly developed growth areas.

A Moving Slope Gets Worse With Every Rain

Get Your Free Assessment Today

An unreinforced slope along Tarrant County's growth corridors can keep moving until it threatens the roadway or structure above it. Call (855) 599-5217 to get a soil nailing assessment from a licensed engineer.

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info
    ***Fees May Apply For Residential Site Visits***

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info

    By using this website, you acknowledge and agree to our Privacy Policy.