Riverbank Erosion Control in North Dakota

Riverbank Erosion Control in North Dakota

Engineered riverbank erosion control across North Dakota—Missouri River. Specialized design/build solutions for NDDOT infrastructure corridors.

Request Riverbank Assessment
River erosion

Riverbanks Erode and Threaten Infrastructure

North Dakota's Missouri River, Red River of the North corridor experience ongoing riverbank erosion driven by current scour at the toe, wave action from vessel traffic and wind, ice scour during spring breakup, and groundwater seepage that destabilizes bank soils from within. This erosion undermines road embankments, exposes buried utilities, threatens bridge abutments, and progressively reduces the setback distance between the river and the infrastructure it parallels.

Riverbank erosion accelerates during flood events when increased flow velocity and elevated water levels attack the bank at heights and energies that base-flow conditions do not reach. A single major flood can remove years' worth of bank that was gradually eroding under normal conditions.

Geohazard Mitigation in North Dakota

North Dakota Banks Eroding?

Protect Banks

Experience You Can Count On

View Project Gallery

How GSI Protects North Dakota's Riverbanks

Engineered Revetment for Bank Protection

Revetment armors the riverbank against current scour, wave wash, and flood-stage attack. GSI designs bank revetment systems calibrated to the specific hydraulic conditions at each site—flow velocity, flood stage, ice scour potential, and vessel wake energy.

  • Riprap armor sized for design flood velocity and wave energy
  • Filter fabric and transition layers matched to bank soil gradation
  • Toe embedment below maximum scour depth for flood-stage protection
  • Key-in at upstream and downstream ends to prevent flanking

Soil Bioengineering for Sustainable Banks

Bioengineered bank stabilization combines structural elements with living plant systems. Willow stakes, coir fiber rolls, and vegetated geogrids establish root networks that reinforce the bank progressively over time—reducing long-term maintenance compared to hard armor alone.

  • Live willow stake installation for rapid root establishment
  • Coir fiber rolls for toe stabilization with biodegradable materials
  • Vegetated geogrids combining structural reinforcement with native plantings
  • Designs compatible with environmental permit requirements for waterways

Emergency Bank Stabilization

During flood events, rapidly eroding banks threaten adjacent infrastructure. GSI's Soil Nail Launcher™ installs emergency bank reinforcement without the excavation that would further destabilize an already-failing bank—providing immediate resistance while permanent protection is designed.

North Dakota Riverbank Erosion Control Process

From initial assessment through verified performance, GSI delivers North Dakota riverbank erosion control solutions in five coordinated steps.

Step 1

Bank Assessment

GSI engineers evaluate site conditions, hazard severity, and infrastructure exposure to determine investigation scope and design approach for your North Dakota project.

Step 2

Hydraulic Analysis

In-house engineers and geologists conduct detailed investigation of the specific conditions along North Dakota's Missouri River corridor driving the riverbank erosion control hazard at your site.

Step 3

Protection Design

Custom bioengineering solution designed by the same engineering team who investigated the site—under one NDDOT-ready contract.

Step 4

Bank Construction

Specialized crews deploy purpose-built equipment across North Dakota's Missouri River corridor, executing the engineered solution under direct engineering supervision.

Warranty

Project documentation meeting NDDOT standards. Performance warranty covering the installed riverbank erosion control solution.

Warranty

Project documentation meeting NDDOT standards. Performance warranty covering the installed riverbank erosion control solution.

Flood-damaged rocky embankment and cliff face

Engineered Riverbank Protection

  • Hydraulic-calibrated design. Armor sizing and toe depth driven by site-specific flow velocity, flood stage, and ice scour potential.
  • Bioengineered sustainability. Living root systems strengthen bank protection over time—reducing long-term maintenance versus hard armor alone.
  • Emergency bank stabilization. Soil Nail Launcher™ installs immediate reinforcement during flood events without excavation.
  • Waterway permit compliance. Designs satisfy environmental requirements for work in and adjacent to regulated waterways.

Explore Our Solutions

Client Reviews

Erosion Control for Water Infrastructure in Minnesota

I am sending this to you from Duluth Minnesota where 4 of your employees just finished working on a wall they had put in for us previously. That was a few years ago after Duluth suffered a flood. We are on Lake Superior and St. Louis County wanted to help stop erosion. The guys worked during the rain and just kept on going, like little Energizer bunnies. Nice fellows, all of them!! They are certainly a credit to your company and I feel it is always good to give thanks to people for a job well done. Please let them know how much we appreciated their dedication to get the job done. We will always wish you and your team good days ahead!!

Geohazard Mitigation for Transportation in the Mid-Atlantic

Hey Jennifer,

I just wanted to say how much I enjoyed working with you guys on [our project]. Under the circumstances with that big of a job, and traffic volume that was being detoured it was a little stressful, however you all were so easy to work with, it made my job easier! Just wanted to thank you and Ryan for keeping me informed weekly and sometimes daily. Sara did an amazing job with the drill pattern and the engineering side of things. Kyle is one of the best superintendents I have worked with, he is good to his guys and got a lot of work done due to his ability to plan ahead and coordinate. Great experience for me and I really enjoyed working with you all, looking forward to our next job sometime. Please let everyone on the crew know that I really appreciate all their hard work, pleasure meeting everyone!

THANK YOU!”

Project Support for Water and Power in California

As told by GSI Project Development Engineer: We are currently close to finishing one of five sites proposed for repair to the [local Water and Power Agency]. The agency folks were very impressed with GSI’s professionalism and support during the repair procedures. Our approach to the project, our field crew’s commitment to safely, our expertise in what we do, and our continuous involvement in the project at multiple levels all contributed to their positive feelings about GSI.

Contact Us for Riverbank Erosion Help

GSI's engineering team is ready for your North Dakota riverbank erosion control challenge. Get your site-specific assessment today.

Call (855) 579-0536

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info
    ***Fees May Apply For Residential Site Visits***

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info

    How Can We Help?

    • Personal Info
    • Contact Info
    • Project Info

    By using this website, you acknowledge and agree to our Privacy Policy. This site is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.