In geohazard mitigation, speed of installation is critical. Active landslides don’t slow down or stop when you start working on them. Unstable rock masses have a very short time frame when they can be stabilized in place. Using the best technology for the job, results in fast installation, which correlates directly with site safety. Using the wrong tool for the job, or only having a few tools to choose from can directly lead to total roadway collapse. For example, the speed of the Soil Nail Launcher™ and GeoStabilization’s purpose-built SuperNails™ prevented total collapse of Interstate 75 in Campbell County, Tennessee, both in 2005 and again in 2012. Conventional drilling rigs could not match the installation rates of either technology, and would not likely have succeeded in preventing failure at either site.