Some Michigan sites sit in steep canyons or behind terrain that eliminates conventional access. Along corridors like M-28, US-2, and Great Lakes shoreline, keweenaw basalt and great lakes glacial deposits create conditions where the only options are Spider Excavators and rope-access crews.
Access Limited highly skilled team is trained for rope-access drilling and Spider Excavator deployment, reaching places across Michigan where conventional drill rigs cannot go. Whether the site is on a steep cliff along M-28, US-2, and Great Lakes shoreline or in a remote canyon, Access Limited brings the equipment and expertise.
Spider Excavators walk from staging areas through the terrain to the work face — no road construction required. On slopes exceeding 60 degrees, these machines drill, excavate, and position materials where no conventional equipment can operate.
When even a Spider Excavator cannot reach the face, rope-access certified crews drill from rope. Vertical rock faces, overhanging terrain, and cliff edges are accessible to these specialty-trained technicians.
Some Michigan sites are hours from the nearest staging point. Access Limited deploys self-sufficient crews through the terrain itself for multi-day operations.
Access Limited operates drill rigs fabricated specifically for the confined and steep conditions that Michigan terrain demands.
Difficult access drilling supports rockfall mitigation, slope stabilization, shoring, and ground improvement across Michigan.
See why MDOT, mining operators, and Great Lakes shipping trust Access Limited for difficult access drilling in Michigan.
Access Limited provides rope-access drilling and Spider Excavator deployment for remote sites across Michigan.