GCS Crusher Wall

GCS Crusher Wall

The existing wall was deemed unsuitable by engineers with Geostabilization International and client. To ensure a long-term solution for the crusher wall, GeoStabilization International’s team designed and constructed a 93m long by 13m high Geosynthetically Confined Soil (GCS) wall. 

Work was completed in a compressed work schedule and during difficult construction conditions. 