Worlds Most Ethical Companies 2019-2020

Draped Mesh Replacement

Draped Mesh Replacement

Once removed, Geostabilization International installed a new wire mesh system in general accordance with existing BC Ministry of Transportation and Infrastructure standard specifications. The new system made use of existing rock anchors where available, following suitable testing to ensure adequate condition and performance. Significant clearing and grubbing was performed as the site was completely overgrown and additional rock anchors were also installed. Site access was extremely limited and overhead utilities limited the use of lifting equipment. 


Project Photos


Meet the Team

Ajay Sharma, Draped Mesh Replacement
Ajay Sharma
Project Development Engineer

Featured Employees

John Hollander, M.B.A., Chief People Officer
John Hollander
M.B.A., Chief People Officer
Dylan Jones, Project Development Engineer
Dylan Jones
Project Development Engineer
Nathan Beard, P.E., M.B.A., Chief Operating Officer
Nathan Beard
P.E., M.B.A., Chief Operating Officer

Meet Our Entire Team