{"id":255,"date":"2023-11-02T10:39:26","date_gmt":"2023-11-02T10:39:26","guid":{"rendered":"https:\/\/www.geostabilization.com\/ca\/?page_id=255"},"modified":"2026-01-16T18:24:47","modified_gmt":"2026-01-16T18:24:47","slug":"bridge-grouting","status":"publish","type":"page","link":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/bridge-grouting\/","title":{"rendered":"Grouting Solutions for Bridge Applications"},"content":{"rendered":"<!-- Start Block: acf\/half-text-half-image -->\n    <section class=\"half-and-half flex-row image-block-right bg-white\">\n        <div class=\"half-and-half-image\">\n                            <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                <\/div>\n        <div class=\"half-and-half-text right\">\n            <div class=\"half-and-half-text-wrapper\">\n                <h4><b>Engineered Grouting for Lasting Bridge Stability<\/b><\/h4>\n<h2><b>Grouting Solutions for Bridge Applications<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">GeoStabilization International provides engineered grouting solutions for bridge applications that stabilize soils, improve foundation performance, and restore long-term structural reliability across Canada. These systems address common subsurface issues beneath abutments, piers, and approach slabs, including settlement, voiding, erosion, and loss of support, helping reduce risk and maintain safe access along critical transportation corridors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Using precision-controlled injection techniques, GSI reinforces bridge foundations with minimal excavation and reduced disruption compared to replacement or reconstruction. Each grouting program is designed around site-specific geotechnical conditions to support safety, traffic continuity, and environmental compliance while extending the service life of bridge assets.<\/span><\/p>\n<p><a class=\"btn btn-primary\" href=\"#contact-form\">CONTACT US<\/a><\/p>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-image -->\n\n<!-- Start Block: acf\/half-text-half-mini-image -->\n    <section class=\"left-image-right-text  bg-blue section-padding\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-4\">\n                    <div class=\"left-image-right-text-image\">\n                        <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-scaled.jpg\" class=\"object-fit\" alt=\"Slurry Grouting\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Jet-Grouting-Kiwirail-bridge-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"col-lg-8\">\n                    <div class=\"left-image-right-text-content\">\n                        <h2><b>What Is Bridge Foundation Grouting?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Bridge foundation grouting stabilizes and strengthens weak or voided ground beneath bridge substructures by injecting engineered grout materials into the soil. Depending on the method, <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/ground-improvement\/grouting\/\">grouting<\/a> can fill voids, densify loose ground, control water movement, and improve load-bearing performance to reduce differential settlement and restore structural support.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Every project begins with a targeted evaluation of soil conditions, groundwater behavior, and performance needs. GSI engineers then develop a site-specific grouting plan that addresses the root causes of distress and supports long-term durability under Canadian climate and hydraulic conditions.<\/span><\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-mini-image -->\n\n<!-- Start Block: acf\/accordion -->\n\n\n    <section class=\"fx-accordion fx-accordion js-accordion section-padding bg-gray\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-md-8 col-md-offset-2\">\n                    <div class=\"accordion__heading-content text-center\">\n                        <h2><b>Grouting Solutions for Bridge Applications<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">GSI provides a range of grouting solutions for bridge applications, selected based on soil type, access constraints, and performance requirements:<\/span><\/p>\n                    <\/div>\n\n                                            <div class=\"fx-accordion__panels\">\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"1\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"1\">Approach Slab Re-Leveling<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Restores smooth, stable transitions between bridge decks and adjoining roadways by lifting and realigning settled slabs to improve ride quality and reduce impact loading.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"2\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"2\">Compaction Grouting<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Injects low-mobility grout to densify weak or loose soils, improving bearing capacity beneath bridge approaches, embankments, and foundation zones.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"3\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"3\">Void Filling<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Fills subsurface washouts and cavities caused by water erosion, reducing the potential for future settlement and restoring support beneath critical elements.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"4\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"4\">Foundation Underpinning<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Reinforces substructures using grouted <a href=\"https:\/\/www.geostabilization.com\/ca\/micropile-contractor\/\">micropiles<\/a> or anchors where deeper support is needed, transferring loads into competent bearing strata for long-term stability.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"5\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"5\">Permeation Grouting<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Seals granular soils to limit infiltration and improve ground performance, supporting durability in areas influenced by groundwater, seasonal saturation, and freeze\u2013thaw cycles.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                            \n                        <\/div>\n                                                        <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/accordion -->\n\n<!-- Start Block: acf\/cta-bar -->\n\n    <section class=\"cta cta--gray \">\n        <div class=\"container\">\n            <div class=\"cta__wrap\">\n                <div class=\"cta__text-orange\">\n                    <div class=\"cta__text-orange__wrap\">\n                                                <h2>Restore bridge foundation support before settlement worsens.<\/h2>                                                                                                <\/div>\n                <\/div>\n                <div class=\"cta__text-gray\">\n                     <div class=\"cta__text-gray__wrap\"> \n                        <h2>Engineered grouting, minimal disruption.<\/h2>                                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/contact-us\/\" title=\"Request a Site Review\" class=\"btn btn-primary\" >Request a Site Review<\/a>\n                         <\/div>                 <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n\n\n<!-- End Block: acf\/cta-bar -->\n\n<!-- Start Block: acf\/full-width-image-video -->\n    <section class=\"fullwidth-image-video section-padding\">\n        <div class=\"background_wrapper\">\n                            <img decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1.jpg\" class=\"object-fit\" alt=\"Permeation Grouting\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1-300x300.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1-150x150.jpg 150w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1-768x768.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Permeation-Grouting-1024x1024-1-600x600.jpg 600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>                    <\/div>\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-10 col-lg-offset-1\">\n                    <div class=\"fullwidth-image-video__content\">\n                        <h2 style=\"text-align: center;\"><b>Why Grouting Matters for Bridge Integrity<\/b><\/h2>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Bridge foundations in Canada face ongoing exposure to heavy loading, freeze\u2013thaw cycles, fluctuating groundwater, and seasonal runoff. Over time, these conditions can contribute to erosion, void formation, and differential settlement that affect approach slabs, abutments, and substructure stability.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Grouting provides an effective rehabilitation option that restores subsurface strength without full replacement. By reinforcing soils and filling voids, GSI\u2019s systems help stabilize foundations, reduce maintenance demands, and support safe, reliable bridge operation.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Because grouting typically requires limited excavation, it can also reduce disturbance near waterways and sensitive environments, supporting sustainable bridge maintenance across Canada, including regions such as Ontario, Alberta, and British Columbia.<\/span><\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/full-width-image-video -->\n\n<!-- Start Block: acf\/half-shaped-image -->\n\n    <section class=\"home-half-and-half half-shaped-image home-image-block-left\">\n        <div class=\"home-half-and-half-text\">\n            <div class=\"home-half-and-half-text__wrapper\">\n                <h2>Sustainable, Efficient Implementation<\/h2>\n<p><span style=\"font-weight: 400;\">GSI\u2019s grouting solutions for bridge applications are designed for efficient installation and long-term durability. Many stabilization projects can be completed within short work windows, supporting faster return to service and reduced disruption to roadway users.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Grout materials and injection methods are selected based on soil behavior, hydraulic conditions, and design performance targets. Through precision-controlled injection and real-time monitoring, GSI verifies consistent placement and reliable results in variable ground conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Compared to excavation-based repairs, grouting can help:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduce disturbance near sensitive waterways<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Minimize waste and material disposal<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Shorten project timelines while maintaining safety and performance<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This approach supports practical rehabilitation outcomes while improving lifecycle value for infrastructure owners.<\/span><\/p>\n                                            <\/div>\n        <\/div>\n        <div class=\"home-half-and-half-image \">\n                            <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-and-Foundations-Feature.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-and-Foundations-Feature.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-and-Foundations-Feature-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-and-Foundations-Feature-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/half-shaped-image -->\n\n<!-- Start Block: acf\/image-buttons -->\n    <section class=\"image-card-slider\">\n        <div class=\"container\">\n            <div class=\"text-center\">\n                <h2>Our Solutions<\/h2>\n            <\/div>\n                            <div class=\"js-image-card-slider fx-slider\">\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"520\" height=\"360\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360.jpg\" class=\"object-fit\" alt=\"Soil Nail Launcher\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360.jpg 520w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360-300x208.jpg 300w\" sizes=\"(max-width: 520px) 100vw, 520px\" \/>                                <\/div>\n\n                                <h4>Soils\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/ground-improvement\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"900\" height=\"700\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole.jpg\" class=\"object-fit\" alt=\"How-to-fill-a-sinkhole\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole.jpg 900w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-300x233.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-768x597.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-771x600.jpg 771w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/>                                <\/div>\n\n                                <h4>Ground Improvement\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/rockfall-mitigation\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1439\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-scaled.jpg\" class=\"object-fit\" alt=\"Rockfall Netting as Rockfall Containment Solution-min\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-300x169.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1024x575.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-768x432.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1536x863.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-2048x1151.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1068x600.jpg 1068w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                <\/div>\n\n                                <h4>Rockfall Mitigation\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/GSIBRIDGE.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/GSIBRIDGE.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/GSIBRIDGE-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/GSIBRIDGE-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                <\/div>\n\n                                <h4>Bridges\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                    <\/div>\n                                        \n\n                \n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/image-buttons -->\n\n<!-- Start Block: acf\/image-icon-buttons -->\n    <section class=\"image-icons-button inner-image-icons-button\">\n        <div class=\"container\">\n                            <div class=\"row\">\n                    <div class=\"col-lg-10 col-lg-offset-1\">\n                        <div class=\"image-icons-button__headline text-center\">\n                            <h2>Our Emergency Response Solutions<\/h2>\n<p>From <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/natural-disasters\/landslides\/\">landslides<\/a> and <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/natural-disasters\/rockfall\/\">rockfalls<\/a> to <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/natural-disasters\/flooding\/\">flooding<\/a> and <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/natural-disasters\/wildfires\/\">wildfires<\/a>, unexpected geohazards demand immediate action. Our <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/\">emergency response<\/a> team is ready 24\/7 to deploy specialized equipment and proven techniques, delivering fast, engineered solutions that restore access and stabilize critical assets when it matters most.<\/p>\n                        <\/div>\n                    <\/div>\n                <\/div>\n            \n                            <div class=\"row js-image-icons-button fx-slider\">\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/natural-disasters\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1920\" height=\"2560\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-scaled.jpg\" class=\"object-fit\" alt=\"Broken road from flooding\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-scaled.jpg 1920w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-225x300.jpg 225w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-768x1024.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-1152x1536.jpg 1152w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-1536x2048.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/IMG_1624-1-450x600.jpg 450w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-rockfall\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">Natural Disasters<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/transportation\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/1_0304191413_HDR_R1.jpg\" class=\"object-fit\" alt=\"Roadway collapse due to embankment failure, with workers assessing damage and erosion near a steep slope.\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/1_0304191413_HDR_R1.jpg 960w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/1_0304191413_HDR_R1-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/1_0304191413_HDR_R1-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2025\/07\/1_0304191413_HDR_R1-800x600.jpg 800w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-road\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">Transportation<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/emergency-response\/commercial-utility\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-scaled.jpg\" class=\"object-fit\" alt=\"Collapsed retaining wall with exposed soil and drainage pipe failure\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Commercial-Retaining-Wall-Failure-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-rail\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">Commercial\/Utility<\/h4>\n                            <\/a>\n                        <\/div>\n                                    <\/div>\n                                <\/div>\n    <\/section>\n\n<!-- End Block: acf\/image-icon-buttons -->\n\n<!-- Start Block: acf\/testimonials -->\n\n  <section class=\"testimonials section-padding bg-gray\">\n    <div class=\"container\">\n      <div class=\"row\">\n                  <div class=\"testimonial__headline text-center\">\n            <h2>Client Reviews<\/h2>\n          <\/div>\n        \n                  <div class=\"js-testimonial fx-slider\">\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Positive Experience Working with Project Team<\/h3>\n                    <p>Justin, I wanted to reach out and let you know that is was a pleasure working with you all at the [\u2026.] Project. The guys on this job were very professional and never once wavered from the plans and specs. These guys did absolutely everything the right way and wanted to make sure that the customer was happy with the work. Again, I appreciate your guys\u2019 hard work and professionalism and look forward to working with you again in the future.<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Professional Project Support in British Columbia, Canada<\/h3>\n                    <p>I am writing this email to let you know that we are honored to work with GSI and your subcontractors as you have all demonstrated professionalism since your very first involvement of the project. Everyone on the project team is highly experienced, efficient and motivated. We also appreciate your professional work and your prompt response to our inquires. We understand that it is a project and a project site with many unique challenges. Many thanks again!<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Trusted Mitigation Project Support from GSI Crew<\/h3>\n                    <p>John Boyd was great. I couldn\u2019t be more pleased with the crew. For the next mitigation project, we\u2019ll work with GSI and specifically request John Boyd.<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                      <\/div>\n        \n              <\/div>\n    <\/div>\n  <\/section>\n\n\n\n\n<!-- End Block: acf\/testimonials -->\n\n<!-- Start Block: acf\/cta-form -->\n    <section class=\"form-text section-padding bg-color-default\" id=\"contact-form\">\n      \n        <div class=\"container\">\n            <div class=\"form-text__flex\">\n                <div class=\"form-text__text\">\n                    <div class=\"subheading\">GET IN TOUCH<\/div>\n<h2>Contact Us Today<\/h2>\n<p><span style=\"font-weight: 400;\">If your bridge abutments, approach slabs, or foundations show signs of settlement, cracking, or erosion, GSI can help. Contact our team to review site conditions and develop engineered grouting solutions that restore foundation stability, support safe operations, and extend service life.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Complete our contact form to request a bridge assessment and explore grouting strategies aligned with long-term performance and resilience.<\/span><\/p>\n<p><a class=\"btn btn-secondary\" href=\"tel:855.559.5217\">855.559.5217<\/a><\/p>\n                <\/div>\n                <div class=\"form-text__form\">\n                    <div class=\"bg-box\">\n                    <\/div>\n                    <div class=\"form-text__form-wrap\">\n                        \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f9-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"9\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/ca\/wp-json\/wp\/v2\/pages\/255#wpcf7-f9-o1\" method=\"post\" class=\"wpcf7-form init cf7mls-no-scroll cf7mls-auto-return-first-step cf7mls-no-moving-animation\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"9\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.0.6\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f9-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"fieldset-cf7mls-wrapper\" data-transition-effects><fieldset class=\"fieldset-cf7mls cf7mls_current_fs\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li class=\"active\"><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>First Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"first-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter first name\" value=\"\" type=\"text\" name=\"first-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Last Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"last-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter last name\" value=\"\" type=\"text\" name=\"last-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How Can We Help You? <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"iwantto\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"iwantto\"><option value=\"\">I want to... *<\/option><option value=\"Schedule a site visit\">Schedule a site visit<\/option><option value=\"Request a proposal\">Request a proposal<\/option><option value=\"Receive technical information\">Receive technical information<\/option><\/select><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n\n    <center><h5>***Fees May Apply For Residential Site Visits***<\/h5><\/center>\n    \n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-1\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Email <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"email\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Phone <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"phone\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Company <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"company\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Title <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"designation\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"designation\" \/><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n    \n<\/div><div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-2\">Back<\/button><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-2\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li ><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n    <div class=\"row\">\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>State\/Province <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"state_province\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"state_province\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How can we help? <\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"how_can_we_help\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"how_can_we_help\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\"> \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <p>By using this website, you acknowledge and agree to our <a href=\"\/privacy-policy\/\" target=\"_blank\">Privacy Policy<\/a>. This site is protected by reCAPTCHA, and the Google <a href=\"https:\/\/policies.google.com\/privacy?hl=en-US\" target=\"_blank\">Privacy Policy<\/a> and <a href=\"https:\/\/policies.google.com\/terms?hl=en-US\" target=\"_blank\">Terms of Service<\/a> apply.<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">                  \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <span class=\"wpcf7-form-control-wrap recaptcha\" data-name=\"recaptcha\"><span data-sitekey=\"6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" class=\"wpcf7-form-control wpcf7-recaptcha g-recaptcha\"><\/span>\r\n<noscript>\r\n\t<div class=\"grecaptcha-noscript\">\r\n\t\t<iframe src=\"https:\/\/www.google.com\/recaptcha\/api\/fallback?k=6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" frameborder=\"0\" scrolling=\"no\" width=\"310\" height=\"430\">\r\n\t\t<\/iframe>\r\n\t\t<textarea name=\"g-recaptcha-response\" rows=\"3\" cols=\"40\" placeholder=\"reCaptcha Response Here\">\r\n\t\t<\/textarea>\r\n\t<\/div>\r\n<\/noscript>\r\n<\/span>\n            <\/div>\n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"padding-right: 0px;\">\n                <button type=\"submit\" class=\"btn btn-primary button-submit\">Submit<\/button>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-3\">Back<\/button><button type=\"button\" style=\"display: none;\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-3\"><img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/fieldset><\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n                    <\/div> \n                <\/div>\n            <\/div>\n        <\/div>\n        \n    <\/section>\n\n\n<!-- End Block: acf\/cta-form -->","protected":false},"excerpt":{"rendered":"<p>GeoStabilization provides grouting solutions for bridge applications including approach slab re-leveling, compaction grouting, and void filling throughout the United States and Canada.<\/p>\n","protected":false},"author":1,"featured_media":3762,"parent":250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-255","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grouting Solutions for Bridge Applications - GeoStabilization International<\/title>\n<meta name=\"description\" content=\"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grouting Solutions for Bridge Applications - GeoStabilization International\" \/>\n<meta property=\"og:description\" content=\"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/\" \/>\n<meta property=\"og:site_name\" content=\"Geostabilization International - Canada\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-16T18:24:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"508\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/\",\"name\":\"Grouting Solutions for Bridge Applications - GeoStabilization International\",\"isPartOf\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg\",\"datePublished\":\"2023-11-02T10:39:26+00:00\",\"dateModified\":\"2026-01-16T18:24:47+00:00\",\"description\":\"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!\",\"breadcrumb\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg\",\"contentUrl\":\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg\",\"width\":1000,\"height\":508},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solutions\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bridges\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Grouting Solutions for Bridge Applications\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/\",\"name\":\"Geostabilization International - Canada\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grouting Solutions for Bridge Applications - GeoStabilization International","description":"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Grouting Solutions for Bridge Applications - GeoStabilization International","og_description":"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!","og_url":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/","og_site_name":"Geostabilization International - Canada","article_modified_time":"2026-01-16T18:24:47+00:00","og_image":[{"width":1000,"height":508,"url":"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/","url":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/","name":"Grouting Solutions for Bridge Applications - GeoStabilization International","isPartOf":{"@id":"https:\/\/www.geostabilization.com\/ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage"},"image":{"@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage"},"thumbnailUrl":"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg","datePublished":"2023-11-02T10:39:26+00:00","dateModified":"2026-01-16T18:24:47+00:00","description":"Looking for grouting solutions for bridge applications? GSI has your back, providing foundation underpinning and approach releveling. Get in touch today!","breadcrumb":{"@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#primaryimage","url":"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg","contentUrl":"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Grouting-Feature_R.jpg","width":1000,"height":508},{"@type":"BreadcrumbList","@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/grouting\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.geostabilization.com\/ca\/"},{"@type":"ListItem","position":2,"name":"Solutions","item":"https:\/\/www.geostabilization.com\/ca\/solutions\/"},{"@type":"ListItem","position":3,"name":"Bridges","item":"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/"},{"@type":"ListItem","position":4,"name":"Grouting Solutions for Bridge Applications"}]},{"@type":"WebSite","@id":"https:\/\/www.geostabilization.com\/ca\/#website","url":"https:\/\/www.geostabilization.com\/ca\/","name":"Geostabilization International - Canada","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/comments?post=255"}],"version-history":[{"count":6,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/255\/revisions"}],"predecessor-version":[{"id":17163,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/255\/revisions\/17163"}],"up":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/media\/3762"}],"wp:attachment":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/media?parent=255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}