{"id":202,"date":"2023-11-02T10:30:10","date_gmt":"2023-11-02T10:30:10","guid":{"rendered":"https:\/\/www.geostabilization.com\/ca\/?page_id=202"},"modified":"2025-12-17T17:29:22","modified_gmt":"2025-12-17T17:29:22","slug":"excavation-shoring","status":"publish","type":"page","link":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/","title":{"rendered":"Excavation Shoring"},"content":{"rendered":"<!-- Start Block: acf\/half-text-half-image -->\n    <section class=\"half-and-half flex-row image-block-right bg-gray\">\n        <div class=\"half-and-half-image\">\n                            <img decoding=\"async\" width=\"1000\" height=\"742\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Excavation-Shoring.jpg\" class=\"object-fit\" alt=\"Excavation Shoring\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Excavation-Shoring.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Excavation-Shoring-300x223.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Excavation-Shoring-768x570.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Excavation-Shoring-809x600.jpg 809w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                <\/div>\n        <div class=\"half-and-half-text right\">\n            <div class=\"half-and-half-text-wrapper\">\n                <h4>EARTH RETENTION SOLUTIONS<\/h4>\n<h2>Engineered Safety and Stability for Canadian Construction Sites<\/h2>\n<p>Excavation shoring is essential for protecting workers, adjacent structures, and surrounding infrastructure during below-grade construction. GeoStabilization International delivers engineered excavation shoring solutions that reduce collapse risk, control ground movement, and support safe, compliant excavation across Canada\u2019s diverse construction environments.<\/p>\n<p>Unprotected or inadequately supported excavations can result in soil failure, worker injury, damage to nearby buildings or utilities, and costly project delays. These risks are heightened in Canada, where variable soils, groundwater, freeze\u2013thaw cycles, and confined urban sites demand carefully engineered support systems. GSI partners with contractors, engineers, and project owners to manage these challenges through site-specific shoring designs that prioritize safety, constructability, and regulatory compliance.<\/p>\n<p><a class=\"btn btn-primary\" href=\"#contact-form\">Contact Us<\/a><\/p>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-image -->\n\n<!-- Start Block: acf\/half-text-half-image -->\n    <section class=\"half-and-half flex-row image-block-left bg-white\">\n        <div class=\"half-and-half-image\">\n                            <img decoding=\"async\" width=\"768\" height=\"1152\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-768x1152-1.jpeg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-768x1152-1.jpeg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-768x1152-1-200x300.jpeg 200w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-768x1152-1-683x1024.jpeg 683w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-768x1152-1-400x600.jpeg 400w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/>                                <\/div>\n        <div class=\"half-and-half-text right\">\n            <div class=\"half-and-half-text-wrapper\">\n                <h2>What is Excavation Shoring?<\/h2>\n<p>Excavation shoring involves the temporary or permanent support of trench and excavation walls to prevent soil collapse and ground movement during construction activities. Properly engineered shoring systems protect personnel working below grade while maintaining stability around adjacent structures, pavements, and underground utilities.<\/p>\n<p>GSI designs excavation shoring systems using detailed geotechnical assessments that consider soil strength, stratigraphy, groundwater conditions, frost depth, excavation geometry, and construction sequencing. This engineering-driven approach ensures that each system provides the appropriate level of support for the site while meeting or exceeding applicable provincial and federal occupational health and safety requirements.<\/p>\n<p>Shoring solutions may remain in place only for the duration of construction or, in some cases, transition into permanent earth retention or foundation support as part of the completed structure.<\/p>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-image -->\n\n<!-- Start Block: acf\/cta-bar -->\n\n    <section class=\"cta cta--gray cta--contact\">\n        <div class=\"container\">\n            <div class=\"cta__wrap\">\n                <div class=\"cta__text-orange\">\n                    <div class=\"\">\n                        <div class=\"subheading\">Get In Touch<\/div>                        <h2>Contact Us Today<\/h2>                                            <\/div>\n                <\/div>\n                <div class=\"cta__text-gray\">\n                    \n                                                <h4><a href=\"tel:855.579.0536\"><i class=\"icon-metro-phone\"><\/i> 855.579.0536<\/a><\/h4>                                                <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/#contact-form\" title=\"Contact Us\" class=\"btn btn-secondary\" >Contact Us<\/a>\n                                        <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n\n\n<!-- End Block: acf\/cta-bar -->\n\n<!-- Start Block: acf\/wysiwyg -->\n<section class=\"wysiwyg section-padding bg-white\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col-lg-10 col-lg-offset-1\">\n\t\t\t\t<div class=\"wysiwyg__content\">\n\t\t\t\t\t<h2>Engineered Shoring Solutions for Project-Specific Conditions<\/h2>\n<p>No two excavations present the same risks. GSI selects and designs shoring systems based on how the excavation will be used, the duration of support required, and site-specific constraints such as access, nearby assets, and groundwater conditions.<\/p>\n<p>Engineered excavation shoring solutions may include:<\/p>\n<ul>\n<li>Rapid support systems for short-term or linear excavations where flexibility and speed are critical<\/li>\n<li>Deep excavation support for sites adjacent to existing buildings, utilities, or transportation corridors<\/li>\n<li>High-capacity shoring systems for challenging soil profiles or high groundwater pressures<\/li>\n<li>Trench protection systems designed to enhance worker safety during utility and pipeline installation<\/li>\n<li>Hybrid shoring solutions that combine temporary excavation support with permanent earth retention or foundation elements<\/li>\n<\/ul>\n<p>Each system is designed to control soil movement, limit settlement, and provide predictable performance throughout construction.<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/step-icon-card -->\n\n    <section class=\"step-icon-card\">\n                <div class=\"step-icon-card-overlay bg-color-default\">\n            <div class=\"container\">\n                                    <div class=\"step-icon-card-heading\">\n                        <h2>Benefits of Engineered Excavation Shoring<\/h2>\n<p>Properly designed excavation shoring delivers measurable safety and project-performance benefits, including:<\/p>\n                    <\/div>\n                                                    <div class=\"step-icon-card-wrapper\">\n                                                    <div class=\"step-icon-card-item\">\n                                <h4>Worker Safety<\/h4>                                                                    <i class=\"icon-checkmark\"><\/i>\n                                                                                                <p>Enhanced worker safety by preventing trench and excavation wall collapse<\/p>                            <\/div>\n                                                    <div class=\"step-icon-card-item\">\n                                <h4>Structure Protection<\/h4>                                                                    <i class=\"icon-checkmark\"><\/i>\n                                                                                                <p>Protection of adjacent structures and utilities from settlement, vibration, or ground movement<\/p>                            <\/div>\n                                                    <div class=\"step-icon-card-item\">\n                                <h4>Regulatory Compliance<\/h4>                                                                    <i class=\"icon-checkmark\"><\/i>\n                                                                                                <p>Regulatory compliance with national and provincial excavation safety standards<\/p>                            <\/div>\n                                                    <div class=\"step-icon-card-item\">\n                                <h4>Project Efficiency<\/h4>                                                                    <i class=\"icon-checkmark\"><\/i>\n                                                                                                <p>Improved construction efficiency through reduced delays, stoppages, and unplanned remediation<\/p>                            <\/div>\n                                                    <div class=\"step-icon-card-item\">\n                                <h4>Risk Reduction<\/h4>                                                                    <i class=\"icon-checkmark\"><\/i>\n                                                                                                <p>Lower overall project risk by minimizing rework, repairs, and incident-related downtime<\/p>                            <\/div>\n                                                                            <div class=\"step-icon-card-item hidden-sm-up\">\n                                <h4>Stabilize & Protect<\/h4>\n                                                                    <i class=\"icon-warranty\"><\/i>\n                                                                                                    <p>Integrating engineered shoring early in project planning allows teams to proactively manage risk rather than reacting to unstable conditions as they develop.<\/p>\n                                                            <\/div>\n                                            <\/div>\n                                                    <div class=\"warenty-info\">\n                        <div class=\"headtext\">\n                            <div class=\"heading\">Stabilize & Protect                            <\/div>\n                        <\/div>\n                        <div class=\"subtext\">\n                                                            <i class=\"icon-warranty\"><\/i>\n                                                                                        <p>Integrating engineered shoring early in project planning allows teams to proactively manage risk rather than reacting to unstable conditions as they develop.<\/p>\n                                                    <\/div>\n                    <\/div>\n                            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/step-icon-card -->\n\n<!-- Start Block: acf\/half-shaped-image -->\n\n    <section class=\"home-half-and-half half-shaped-image home-image-block-right\">\n        <div class=\"home-half-and-half-text\">\n            <div class=\"home-half-and-half-text__wrapper\">\n                <h2><b>Applications Across Canadian Construction Environments<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">GSI\u2019s excavation shoring systems support a wide range of construction and infrastructure projects across Canada. These systems are successfully deployed in dense urban settings, high-traffic corridors, industrial facilities, and remote or access-constrained environments.<\/span><\/p>\n                                    <div class=\"img-text-flex\">\n\n                                                    <div class=\"img-text-item\">\n                                <div class=\"img-text\">\n                                                                            <div class=\"icons-text__img\">\n                                            <i class=\"icon-building\"><\/i>\n                                        <\/div>\n                                                                        <h4>Foundation and basement construction for residential, commercial, and institutional buildings<\/h4>\n                                <\/div>\n                            <\/div>\n                                                    <div class=\"img-text-item\">\n                                <div class=\"img-text\">\n                                                                            <div class=\"icons-text__img\">\n                                            <i class=\"icon-concrete\"><\/i>\n                                        <\/div>\n                                                                        <h4>Underground utility installation and rehabilitation<\/h4>\n                                <\/div>\n                            <\/div>\n                                                    <div class=\"img-text-item\">\n                                <div class=\"img-text\">\n                                                                            <div class=\"icons-text__img\">\n                                            <i class=\"icon-bridge\"><\/i>\n                                        <\/div>\n                                                                        <h4>Transportation infrastructure such as tunnels, bridge abutments, and underpasses<\/h4>\n                                <\/div>\n                            <\/div>\n                                                    <div class=\"img-text-item\">\n                                <div class=\"img-text\">\n                                                                            <div class=\"icons-text__img\">\n                                            <i class=\"icon-machine\"><\/i>\n                                        <\/div>\n                                                                        <h4>Retaining wall construction and replacement<\/h4>\n                                <\/div>\n                            <\/div>\n                                                    <div class=\"img-text-item\">\n                                <div class=\"img-text\">\n                                                                            <div class=\"icons-text__img\">\n                                            <i class=\"icon-rockfall\"><\/i>\n                                        <\/div>\n                                                                        <h4>Temporary earth retention during slope repair or infrastructure rehabilitation<\/h4>\n                                <\/div>\n                            <\/div>\n                        \n                    <\/div>\n                                            <\/div>\n        <\/div>\n        <div class=\"home-half-and-half-image \">\n                            <img decoding=\"async\" width=\"1920\" height=\"2560\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-scaled.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-scaled.jpg 1920w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-225x300.jpg 225w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-768x1024.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-1152x1536.jpg 1152w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-1536x2048.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Hole-Excavation-Preparation_Setting-Casings-1-450x600.jpg 450w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                                <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/half-shaped-image -->\n\n<!-- Start Block: acf\/half-text-half-mini-image -->\n    <section class=\"left-image-right-text  bg-gray section-padding\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-4\">\n                    <div class=\"left-image-right-text-image\">\n                        <img decoding=\"async\" width=\"360\" height=\"520\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Excavation_Shoring_Micropile_CAN_BC_Sneena_Rd3_thumb2_360x520.jpg\" class=\"object-fit\" alt=\"Excavation Shoring and Micropiles\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Excavation_Shoring_Micropile_CAN_BC_Sneena_Rd3_thumb2_360x520.jpg 360w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Excavation_Shoring_Micropile_CAN_BC_Sneena_Rd3_thumb2_360x520-208x300.jpg 208w\" sizes=\"(max-width: 360px) 100vw, 360px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"col-lg-8\">\n                    <div class=\"left-image-right-text-content\">\n                        <h2>Designed for Canadian Conditions and Regulatory Requirements<\/h2>\n<p>Construction sites across Canada face unique challenges, including seasonal frost, freeze\u2013thaw cycles, fluctuating groundwater, and limited work windows. In major urban centres such as Toronto, Vancouver, and Calgary, excavations often occur within tight footprints and in close proximity to existing infrastructure. In rural and northern regions, variable soil strength and high water tables add additional complexity.<\/p>\n<p>GSI designs excavation shoring systems to account for these realities, combining local geotechnical insight with practical construction experience. Systems are engineered to perform reliably throughout seasonal changes while supporting safe, efficient construction practices that align with provincial occupational health and safety enforcement.<\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-mini-image -->\n\n<!-- Start Block: acf\/full-width-image-video -->\n    <section class=\"fullwidth-image-video section-padding\">\n        <div class=\"background_wrapper\">\n                            <img decoding=\"async\" width=\"2000\" height=\"500\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image.jpg\" class=\"object-fit\" alt=\"Excavation Shoring\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image.jpg 2000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image-300x75.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image-1024x256.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image-768x192.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image-1536x384.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Excavation-Shoring-Hero-Image-1920x480.jpg 1920w\" sizes=\"(max-width: 2000px) 100vw, 2000px\" \/>                    <\/div>\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-10 col-lg-offset-1\">\n                    <div class=\"fullwidth-image-video__content\">\n                        <h2>Accountable Delivery Through Design-Build-Warranty<\/h2>\n<p>Excavation support involves inherent uncertainty below ground. GSI delivers shoring systems through a design-build-warranty model, providing single-point accountability from initial assessment through installation and performance. This approach reduces coordination risk, simplifies project delivery, and gives contractors and owners confidence that excavation support systems will perform as intended throughout construction.<\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/full-width-image-video -->\n\n<!-- Start Block: acf\/testimonials -->\n\n  <section class=\"testimonials section-padding bg-white\">\n    <div class=\"container\">\n      <div class=\"row\">\n                  <div class=\"testimonial__headline text-center\">\n            <h2>Client Reviews<\/h2>\n          <\/div>\n        \n                  <div class=\"js-testimonial fx-slider\">\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Professional and Responsive Project Support in Canada<\/h3>\n                    <p>Steve [Wahl] has been gracious with his time during our visits. The feedback \u2026 has been very positive (almost glowing) and also your quick action to resolve any concerns from our last visit ... was greatly appreciated\u2026. Keep up the great work, you and your team\u2019s professionalism has not gone unnoticed.<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Successful Project and Teamwork in British Columbia, Canada<\/h3>\n                    <p>The final product for the winter looks very well done and Matthew was great to work with. I look forward to working with your team next Spring and on future projects.<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                          <div class=\"testimonial-item fx-slide\">\n                <div class=\"testimonial-item-wrap\">\n                  <div class=\"testimonial-text-scroll\">\n                    <h3>Safe and Professional Roadway Project in British Columbia, Canada<\/h3>\n                    <p>As told by GSI Project Development Engineer: I just chatted with [the] Operation Manager for the Hwy 3 Char Creek project. He is extremely pleased with the way we are progressing, and very impressed with Matt and the crew\u2019s professionalism and communication. I understand several Ministry reps were on site and given the red-carpet treatment and full briefing. They were pleased with the visit. Also, through all the years of work [he] had never experienced such a positive Workers Compensation Board safety inspection. In a thorough inspection that was nearly 2 hours in length, I understand the only comments the inspector could come up with were:<\/p>\n<ul>\n<li>the fire extinguisher on the rental fork lift was missing an inspection tag (fully functional, good shape unit, just missing a tag),<\/li>\n<li>the flagger didn\u2019t have a reflective strip over the top of the hard hat (they have reflectors all the way around, but\u2026. not over the top)<\/li>\n<\/ul>\n<p>Nice work Gentleman!<\/p>\n                  <\/div>\n                  <div class=\"testimonial-bottom-text\">\n                                      <\/div>\n                <\/div>\n              <\/div>\n                      <\/div>\n        \n              <\/div>\n    <\/div>\n  <\/section>\n\n\n\n\n<!-- End Block: acf\/testimonials -->\n\n<!-- Start Block: acf\/cta-form -->\n    <section class=\"form-text section-padding bg-color-default\" id=\"contact-form\">\n      \n        <div class=\"container\">\n            <div class=\"form-text__flex\">\n                <div class=\"form-text__text\">\n                    <h4>Don\u2019t compromise on safety! Get reliable &amp; effective excavation shoring solutions<\/h4>\n<h2>Let\u2019s Review Your Excavation Conditions<\/h2>\n<p>If your project involves deep excavation, trenching, or work near existing structures or utilities, connect with GSI to review site conditions and discuss excavation shoring strategies aligned with worker safety, regulatory compliance, and construction efficiency.<\/p>\n<p><a class=\"btn btn-secondary\" href=\"tel:8555790536\">855.579.0536<\/a><\/p>\n                <\/div>\n                <div class=\"form-text__form\">\n                    <div class=\"bg-box\">\n                    <\/div>\n                    <div class=\"form-text__form-wrap\">\n                        \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f9-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"9\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/ca\/wp-json\/wp\/v2\/pages\/202#wpcf7-f9-o1\" method=\"post\" class=\"wpcf7-form init cf7mls-no-scroll cf7mls-auto-return-first-step cf7mls-no-moving-animation\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"9\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.0.6\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f9-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"fieldset-cf7mls-wrapper\" data-transition-effects><fieldset class=\"fieldset-cf7mls cf7mls_current_fs\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li class=\"active\"><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>First Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"first-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter first name\" value=\"\" type=\"text\" name=\"first-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Last Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"last-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter last name\" value=\"\" type=\"text\" name=\"last-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How Can We Help You? <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"iwantto\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"iwantto\"><option value=\"\">I want to... *<\/option><option value=\"Schedule a site visit\">Schedule a site visit<\/option><option value=\"Request a proposal\">Request a proposal<\/option><option value=\"Receive technical information\">Receive technical information<\/option><\/select><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n\n    <center><h5>***Fees May Apply For Residential Site Visits***<\/h5><\/center>\n    \n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-1\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Email <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"email\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Phone <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"phone\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Company <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"company\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Title <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"designation\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"designation\" \/><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n    \n<\/div><div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-2\">Back<\/button><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-2\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li ><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n    <div class=\"row\">\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>State\/Province <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"state_province\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"state_province\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How can we help? <\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"how_can_we_help\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"how_can_we_help\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\"> \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <p>By using this website, you acknowledge and agree to our <a href=\"\/privacy-policy\/\" target=\"_blank\">Privacy Policy<\/a>. This site is protected by reCAPTCHA, and the Google <a href=\"https:\/\/policies.google.com\/privacy?hl=en-US\" target=\"_blank\">Privacy Policy<\/a> and <a href=\"https:\/\/policies.google.com\/terms?hl=en-US\" target=\"_blank\">Terms of Service<\/a> apply.<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">                  \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <span class=\"wpcf7-form-control-wrap recaptcha\" data-name=\"recaptcha\"><span data-sitekey=\"6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" class=\"wpcf7-form-control wpcf7-recaptcha g-recaptcha\"><\/span>\r\n<noscript>\r\n\t<div class=\"grecaptcha-noscript\">\r\n\t\t<iframe src=\"https:\/\/www.google.com\/recaptcha\/api\/fallback?k=6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" frameborder=\"0\" scrolling=\"no\" width=\"310\" height=\"430\">\r\n\t\t<\/iframe>\r\n\t\t<textarea name=\"g-recaptcha-response\" rows=\"3\" cols=\"40\" placeholder=\"reCaptcha Response Here\">\r\n\t\t<\/textarea>\r\n\t<\/div>\r\n<\/noscript>\r\n<\/span>\n            <\/div>\n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"padding-right: 0px;\">\n                <button type=\"submit\" class=\"btn btn-primary button-submit\">Submit<\/button>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-3\">Back<\/button><button type=\"button\" style=\"display: none;\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-3\"><img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/fieldset><\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n                    <\/div> \n                <\/div>\n            <\/div>\n        <\/div>\n        \n    <\/section>\n\n\n<!-- End Block: acf\/cta-form -->\n\n<!-- Start Block: acf\/image-buttons -->\n    <section class=\"image-card-slider\">\n        <div class=\"container\">\n            <div class=\"text-center\">\n                <h2>Our Solutions<\/h2>\n            <\/div>\n                            <div class=\"js-image-card-slider fx-slider\">\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"520\" height=\"360\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360.jpg\" class=\"object-fit\" alt=\"Soil Nail Launcher\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360.jpg 520w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_Landslide_Soil-Nail-Launcher_MT-Malmstrrem_Lewiston_thumb_520x360-300x208.jpg 300w\" sizes=\"(max-width: 520px) 100vw, 520px\" \/>                                <\/div>\n\n                                <h4>Earth Retention\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/ground-improvement\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"900\" height=\"700\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole.jpg\" class=\"object-fit\" alt=\"How-to-fill-a-sinkhole\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole.jpg 900w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-300x233.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-768x597.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/How-to-fill-a-sinkhole-771x600.jpg 771w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/>                                <\/div>\n\n                                <h4>Ground Improvement\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/rockfall-mitigation\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1439\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-scaled.jpg\" class=\"object-fit\" alt=\"Rockfall Netting as Rockfall Containment Solution-min\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-300x169.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1024x575.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-768x432.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1536x863.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-2048x1151.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Rockfall-Netting-as-Rockfall-Containment-Solution-min-1068x600.jpg 1068w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                <\/div>\n\n                                <h4>Rockfall Mitigation\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-scaled.jpg\" class=\"object-fit\" alt=\"Casing Drill on Bridge Rehabilitation\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                <\/div>\n\n                                <h4>Bridges\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                    <\/div>\n                                        \n\n                \n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/image-buttons -->","protected":false},"excerpt":{"rendered":"<p>Excavation Shoring Expert Excavation Shoring Services for Your Next Construction Project Looking for expert excavation shoring services for your next construction project? Trust our team at GeoStabilization International for top-of-the-line equipment and safety solutions. Contact Us<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":196,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-202","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Excavation Shoring | GeoStabilization International<\/title>\n<meta name=\"description\" content=\"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Excavation Shoring | GeoStabilization International\" \/>\n<meta property=\"og:description\" content=\"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/\" \/>\n<meta property=\"og:site_name\" content=\"Geostabilization International - Canada\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-17T17:29:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/\",\"name\":\"Excavation Shoring | GeoStabilization International\",\"isPartOf\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\"},\"datePublished\":\"2023-11-02T10:30:10+00:00\",\"dateModified\":\"2025-12-17T17:29:22+00:00\",\"description\":\"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solutions\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Earth Retention\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Excavation Shoring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/\",\"name\":\"Geostabilization International - Canada\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Excavation Shoring | GeoStabilization International","description":"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Excavation Shoring | GeoStabilization International","og_description":"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.","og_url":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/","og_site_name":"Geostabilization International - Canada","article_modified_time":"2025-12-17T17:29:22+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/","url":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/","name":"Excavation Shoring | GeoStabilization International","isPartOf":{"@id":"https:\/\/www.geostabilization.com\/ca\/#website"},"datePublished":"2023-11-02T10:30:10+00:00","dateModified":"2025-12-17T17:29:22+00:00","description":"Looking for top-notch excavation and shoring solutions? Explore our project gallery today at Access Limited for expert insight and innovative techniques.","breadcrumb":{"@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/excavation-shoring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.geostabilization.com\/ca\/"},{"@type":"ListItem","position":2,"name":"Solutions","item":"https:\/\/www.geostabilization.com\/ca\/solutions\/"},{"@type":"ListItem","position":3,"name":"Earth Retention","item":"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/"},{"@type":"ListItem","position":4,"name":"Excavation Shoring"}]},{"@type":"WebSite","@id":"https:\/\/www.geostabilization.com\/ca\/#website","url":"https:\/\/www.geostabilization.com\/ca\/","name":"Geostabilization International - Canada","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/comments?post=202"}],"version-history":[{"count":11,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/202\/revisions"}],"predecessor-version":[{"id":16622,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/202\/revisions\/16622"}],"up":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/196"}],"wp:attachment":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/media?parent=202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}