{"id":181,"date":"2023-11-02T10:26:28","date_gmt":"2023-11-02T10:26:28","guid":{"rendered":"https:\/\/www.geostabilization.com\/ca\/?page_id=181"},"modified":"2025-12-22T18:04:27","modified_gmt":"2025-12-22T18:04:27","slug":"railway","status":"publish","type":"page","link":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/","title":{"rendered":"Railway Geohazard Mitigation &amp; Railroad Engineering"},"content":{"rendered":"<!-- Start Block: acf\/half-text-half-image -->\n    <section class=\"half-and-half flex-row image-block-left bg-white\">\n        <div class=\"half-and-half-image\">\n                            <img decoding=\"async\" width=\"2048\" height=\"1536\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet.jpg\" class=\"object-fit\" alt=\"RailJet Canada\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailJet-800x600.jpg 800w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/>                                <\/div>\n        <div class=\"half-and-half-text right\">\n            <div class=\"half-and-half-text-wrapper\">\n                <h2><b>Railway Geohazard Mitigation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Safe, reliable rail operations depend on stable ground conditions beneath and around the track structure. Across Canada, rail corridors are exposed to settlement, slope movement, erosion, freeze\u2013thaw cycles, and aging infrastructure that can lead to slow orders, service disruptions, and increased safety risk. GeoStabilization International partners with rail operators, asset managers, and engineering teams to stabilize rail corridors, reduce geotechnical risk, and support long-term network performance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Rather than treating surface symptoms alone, GSI focuses on addressing the root causes of track instability, delivering engineered geohazard mitigation solutions that improve safety, reduce maintenance demands, and keep rail traffic moving.<\/span><\/p>\n<p><a class=\"btn btn-primary\" href=\"#contact-form\">Contact Us<\/a><\/p>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-image -->\n\n<!-- Start Block: acf\/wysiwyg -->\n<section class=\"wysiwyg section-padding bg-blue\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col-lg-10 col-lg-offset-1\">\n\t\t\t\t<div class=\"wysiwyg__content\">\n\t\t\t\t\t<h2 style=\"text-align: center;\"><b>Supporting Safe Operations and Corridor Reliability<\/b><\/h2>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Railway infrastructure operates under continuous loading and strict safety requirements. Even small changes in subgrade performance or slope stability can affect track geometry, vibration, and alignment, increasing operational risk.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">GSI focuses exclusively on geohazard mitigation, allowing teams to evaluate ground behavior, design targeted stabilization systems, and install solutions that restore stability while minimizing disruption to rail operations. Each approach is tailored to Canadian conditions, including seasonal freeze\u2013thaw impacts, variable subsurface materials, and constrained rights-of-way.<\/span><\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/accordion -->\n\n\n    <section class=\"fx-accordion fx-accordion js-accordion section-padding bg-gray\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-md-8 col-md-offset-2\">\n                    <div class=\"accordion__heading-content text-center\">\n                        <h2 style=\"text-align: center;\"><b>Outcome-Driven Railway Stabilization Solutions<\/b><\/h2>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">GSI delivers railway geohazard mitigation solutions aligned with the outcomes rail operators care about most:<\/span><\/p>\n                    <\/div>\n\n                                            <div class=\"fx-accordion__panels\">\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"1\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"1\">Improved Track Geometry and Load Distribution<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Stabilization systems that reduce settlement, improve uniform support beneath the track, and help maintain alignment under repeated loading.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"2\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"2\">Reduced Maintenance Cycles and Disruptions<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Root-cause stabilization that limits recurring ballast and tie maintenance, helping break cycles of repeated repair.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                                                            <article class=\"fx-accordion__panel js-accordion-item is-expanded icon--collapse\" data-accordion-id=\"3\">\n                                    <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"3\">Long-Term Corridor Performance<\/button>\n                                    <div class=\"fx-accordion__panel__content\">\n                                        <p><span style=\"font-weight: 400;\">Engineered solutions that extend service life and improve performance across active rail corridors.<\/span><\/p>\n                                    <\/div>\n                                <\/article>\n                            \n                        <\/div>\n                                                        <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/accordion -->\n\n<!-- Start Block: acf\/half-text-half-image -->\n    <section class=\"half-and-half flex-row image-block-right bg-white\">\n        <div class=\"half-and-half-image\">\n                            <img decoding=\"async\" width=\"756\" height=\"1008\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Sinkhole-Remediation-Compaction-Grouting-in-Progress.jpg\" class=\"object-fit\" alt=\"Sinkhole Remediation Compaction Grouting in Progress Canada\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Sinkhole-Remediation-Compaction-Grouting-in-Progress.jpg 756w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Sinkhole-Remediation-Compaction-Grouting-in-Progress-225x300.jpg 225w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/Sinkhole-Remediation-Compaction-Grouting-in-Progress-450x600.jpg 450w\" sizes=\"(max-width: 756px) 100vw, 756px\" \/>                                <\/div>\n        <div class=\"half-and-half-text right\">\n            <div class=\"half-and-half-text-wrapper\">\n                <h2><b>Subgrade and Soil Stabilization for Rail Corridors<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Subgrade performance plays a critical role in overall track stability. Weak or variable soils beneath the ballast can lead to uneven settlement, increased vibration, and accelerated degradation of track components.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">GSI designs soil and subgrade stabilization systems that:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Strengthen weak ground beneath active track<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Restore uniform support under loading<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduce settlement and deformation over time<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Many stabilization activities can be completed while rail operations continue, minimizing service interruptions and environmental impact compared to more intrusive traditional methods.<\/span><\/p>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-image -->\n\n<!-- Start Block: acf\/half-text-half-mini-image -->\n    <section class=\"left-image-right-text  bg-blue section-padding\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-4\">\n                    <div class=\"left-image-right-text-image\">\n                        <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-scaled.jpg\" class=\"object-fit\" alt=\"RailJET Canada\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/RailJET-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"col-lg-8\">\n                    <div class=\"left-image-right-text-content\">\n                        <h2><b>RailJET\u00ae Subgrade Stabilization<\/b><\/h2>\n<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.geostabilization.com\/ca\/techniques\/technology\/railjet\/\">RailJET\u00ae<\/a> is a field-proven subgrade stabilization solution developed specifically for railway applications. The process uses horizontal jet <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/ground-improvement\/grouting\/\">grouting<\/a> to mix in-place soils with cementitious materials, forming rigid inclusions that improve bearing capacity and shear resistance beneath the track. This approach allows rail operators to address underlying ground issues without extended outages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">RailJET\u00ae offers key operational advantages:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Stabilization beneath active track with minimal disruption<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Precise installation near sensitive infrastructure<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Elimination of hidden voids and ballast pockets<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Faster return to normal operations compared to conventional reconstruction<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<\/ul>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-mini-image -->\n\n<!-- Start Block: acf\/cta-bar -->\n\n    <section class=\"cta cta--gray \">\n        <div class=\"container\">\n            <div class=\"cta__wrap\">\n                <div class=\"cta__text-orange\">\n                    <div class=\"cta__text-orange__wrap\">\n                                                <h2>Get in Touch<\/h2>                                                                                                <\/div>\n                <\/div>\n                <div class=\"cta__text-gray\">\n                     <div class=\"cta__text-gray__wrap\"> \n                        <h2>855.579.0536<\/h2>                                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/#contact-form\" title=\"Contact Us\" class=\"btn btn-primary\" >Contact Us<\/a>\n                         <\/div>                 <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n\n\n<!-- End Block: acf\/cta-bar -->\n\n<!-- Start Block: acf\/half-gallery-half-text -->\n\n    <section class=\"image-slider-text  section-padding bg-white\">\n        <div class=\"container\">\n            <div class=\"image-slider-text-wrapper\">\n                <div class=\"image-slider-text-left\">\n                    <h2><b>Railway Bridge Abutment Stabilization<\/b><\/h2>\n<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/\">Bridge abutments<\/a> are critical load-bearing elements within rail networks and are often exposed to erosion, groundwater pressure, and aging materials. When abutments begin to move or degrade, speed restrictions and safety concerns can affect the entire corridor. <\/span><\/p>\n<p>To restore structural reliability, reduce operational risk, and extend the service life of rail bridges across Canada, GSI provides engineered abutment stabilization and repair solutions, including:<\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structural reinforcement and <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/foundations\/underpinning-foundation-support\/\">underpinning<\/a><\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Soil and foundation <a href=\"https:\/\/www.geostabilization.com\/ca\/slope-stabilization-contractor\/\">stabilization<\/a><\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Grouting to improve surrounding ground conditions<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.geostabilization.com\/ca\/techniques\/mitigation-solutions\/horizontal-drains\/\">Drainage<\/a> and erosion control measures<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<\/ul>\n                <\/div>\n                <div class=\"image-slider-text-right\">\n\n                    <div class=\"project-detail-image-slider\">\n                        <div class=\"main\">\n                            <div class=\"project-detail-slider-for fx-slider\">\n                                                                                                            <div class=\"project-slider-image fx-slide\">\n                                            <div class=\"project-slider-image-col\">\n                                                <img decoding=\"async\" width=\"764\" height=\"513\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway.jpg 764w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway-300x201.jpg 300w\" sizes=\"(max-width: 764px) 100vw, 764px\" \/>                                            <\/div>\n                                        <\/div>\n                                                                            <div class=\"project-slider-image fx-slide\">\n                                            <div class=\"project-slider-image-col\">\n                                                <img decoding=\"async\" width=\"764\" height=\"513\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1.jpg 764w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1-300x201.jpg 300w\" sizes=\"(max-width: 764px) 100vw, 764px\" \/>                                            <\/div>\n                                        <\/div>\n                                                                                                                                <\/div>\n                            <div class=\"project-detail-slider-nav fx-slider\">\n                                                                                                            <div class=\"project-slider-item-image fx-slide\">\n                                            <img decoding=\"async\" width=\"764\" height=\"513\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway.jpg 764w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway-300x201.jpg 300w\" sizes=\"(max-width: 764px) 100vw, 764px\" \/>                                        <\/div>\n                                                                            <div class=\"project-slider-item-image fx-slide\">\n                                            <img decoding=\"async\" width=\"764\" height=\"513\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1.jpg 764w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Railway1-300x201.jpg 300w\" sizes=\"(max-width: 764px) 100vw, 764px\" \/>                                        <\/div>\n                                                                                                                                <\/div>\n                        <\/div>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<!-- End Block: acf\/half-gallery-half-text -->\n\n<!-- Start Block: acf\/wysiwyg -->\n<section class=\"wysiwyg section-padding bg-gray\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col-lg-10 col-lg-offset-1\">\n\t\t\t\t<div class=\"wysiwyg__content\">\n\t\t\t\t\t<h2 style=\"text-align: center;\"><b>Proven Experience in Difficult and Limited-Access Rail Environments<\/b><\/h2>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Many rail corridors traverse steep valleys, remote terrain, and environmentally sensitive areas. GSI\u2019s teams are experienced working safely within active rail environments and coordinating closely with rail operations and safety personnel.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Field-proven installation methods and <a href=\"https:\/\/www.geostabilization.com\/ca\/techniques\/technology\/\">limited-access equipment<\/a> allow stabilization work to proceed efficiently where conventional construction approaches are not feasible, while maintaining a strong focus on safety and quality.<\/span><\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/half-text-half-mini-image -->\n    <section class=\"left-image-right-text image-right bg-blue section-padding\">\n        <div class=\"container\">\n            <div class=\"row\">\n                <div class=\"col-lg-4\">\n                    <div class=\"left-image-right-text-image\">\n                        <img decoding=\"async\" width=\"609\" height=\"513\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Specialized-Tools-for-Railway-Geohazard-Mitigation1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Specialized-Tools-for-Railway-Geohazard-Mitigation1.jpg 609w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Specialized-Tools-for-Railway-Geohazard-Mitigation1-300x253.jpg 300w\" sizes=\"(max-width: 609px) 100vw, 609px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"col-lg-8\">\n                    <div class=\"left-image-right-text-content\">\n                        <h2><b>Your Partner for Railway Geohazard Mitigation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Rail operators across Canada rely on GSI for its focused expertise and experience stabilizing active rail corridors. Clients benefit from:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Practical geohazard assessment informed by field experience<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In-house engineering aligned with constructability and performance<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Skilled crews experienced working under live rail conditions<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Stabilization strategies designed for long-term performance<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Collaborative <a href=\"https:\/\/www.geostabilization.com\/ca\/why-gsi\/how-we-work\/design-build\/\">design-build delivery<\/a> that supports safe operations<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">GSI operates as a long-term partner, helping rail teams manage geotechnical risk with confidence.<\/span><\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/half-text-half-mini-image -->\n\n<!-- Start Block: acf\/image-buttons -->\n    <section class=\"image-card-slider\">\n        <div class=\"container\">\n            <div class=\"text-center\">\n                <h3>Related Services<\/h3>\n            <\/div>\n                            <div class=\"js-image-card-slider fx-slider\">\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/foundations\/cased-micropiles\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"844\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1.jpg 1500w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1-300x169.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1-1024x576.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1-768x432.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Micropiles-1-1066x600.jpg 1066w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                <\/div>\n\n                                <h4>Micropiles\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/ground-improvement\/grouting\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Compaction-Grouting.jpg\" class=\"object-fit\" alt=\"Compaction grouting\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Compaction-Grouting.jpg 800w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Compaction-Grouting-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Compaction-Grouting-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>                                <\/div>\n\n                                <h4>Grouting\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/landslide-repair-and-remediation\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-scaled.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Landslide-After-1-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                <\/div>\n\n                                <h4>Landslide Stabilization\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/bridges\/innovative-replacement-solutions\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-scaled.jpg\" class=\"object-fit\" alt=\"Casing Drill on Bridge Rehabilitation\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-scaled.jpg 2560w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-1536x1152.jpg 1536w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-2048x1536.jpg 2048w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2024\/02\/20220317_184314-1-800x600.jpg 800w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>                                <\/div>\n\n                                <h4>Innovative Bridge Replacement Solutions\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                            <div class=\"image-card-slide-item fx-slide has-text\">\n                                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/solutions\/earth-retention\/mse-gabion-pile-historic-rock-wall-repair\/\" class=\"image-card-slide-box empty-link\">\n                                <div class=\"image-card-slide-image\">\n                                    <img decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_20180222_074649623_R1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_20180222_074649623_R1.jpg 600w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_20180222_074649623_R1-300x225.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/>                                <\/div>\n\n                                <h4>Retaining Wall Repairs\n                                <\/h4>\n\n                            <\/a>\n                            \n                        <\/div>\n\n                                    <\/div>\n                                        \n\n                \n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/image-buttons -->\n\n<!-- Start Block: acf\/featured-projects -->\n    <section class=\"featured-buttons\">\n        <div class=\"container\">\n            <div class=\"featured-buttons__flex\">\n                <div class=\"featured-buttons__text text-center\">\n                    <div class=\"subheading\">OUR EXPERIENCES<\/div>\n<h2>Related Projects<\/h2>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.geostabilization.com\/ca\/project-gallery\/\">VIEW ALL PROJECTS<\/a><\/p>\n                <\/div>\n                <div class=\"featured-buttons__slider\">\n                    <div class=\"featured-buttons__slider__wrap\">\n\n                                                    <div class=\"js-featured-slider fx-slider\">\n                                                                    <div class=\"featured-slider-item fx-slide\">\n                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/project-gallery\/mse-wall-bridge-abutment-repair\/\" class=\"featured-button\">\n                                                                                        <img decoding=\"async\" width=\"520\" height=\"360\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_railroad_oregon_LOWRES_thumb1.jpg\" class=\"featured-button__img\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_railroad_oregon_LOWRES_thumb1.jpg 520w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Services_railroad_oregon_LOWRES_thumb1-300x208.jpg 300w\" sizes=\"(max-width: 520px) 100vw, 520px\" \/>                                            <div class=\"featured-button__hover\">\n                                                                                                                                                    <ul class=\"featured-button__tag\">\n                                                                                                                    <li>Railroad Geohazard Mitigation<\/li>\n                                                                                                            <\/ul>\n                                                                                                <h4 class=\"featured-button__title\">MSE Wall Bridge Abutment Repair<\/h4>\n                                                <button class=\"featured-button__cta\">View Project<\/button>\n                                            <\/div>\n                                        <\/a>\n                                    <\/div>\n                                                                    <div class=\"featured-slider-item fx-slide\">\n                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/project-gallery\/rock-scaling-at-a-railroad-tunnel-portal\/\" class=\"featured-button\">\n                                                                                        <img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_0328.jpg\" class=\"featured-button__img\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_0328.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_0328-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_0328-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/IMG_0328-800x600.jpg 800w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                            <div class=\"featured-button__hover\">\n                                                                                                                                                    <ul class=\"featured-button__tag\">\n                                                                                                                    <li>Railroad Geohazard Mitigation<\/li>\n                                                                                                                    <li>Rock Scaling<\/li>\n                                                                                                                    <li>Rockfall<\/li>\n                                                                                                            <\/ul>\n                                                                                                <h4 class=\"featured-button__title\">Railroad Tunnel Portal Rock Scaling<\/h4>\n                                                <button class=\"featured-button__cta\">View Project<\/button>\n                                            <\/div>\n                                        <\/a>\n                                    <\/div>\n                                                                    <div class=\"featured-slider-item fx-slide\">\n                                        <a href=\"https:\/\/www.geostabilization.com\/ca\/project-gallery\/rail-spur-gcs-walls\/\" class=\"featured-button\">\n                                                                                        <img decoding=\"async\" width=\"898\" height=\"584\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailSpur1.png\" class=\"featured-button__img\" alt=\"Rail spur\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailSpur1.png 898w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailSpur1-300x195.png 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/RailSpur1-768x499.png 768w\" sizes=\"(max-width: 898px) 100vw, 898px\" \/>                                            <div class=\"featured-button__hover\">\n                                                                                                                                                    <ul class=\"featured-button__tag\">\n                                                                                                                    <li>Rail Spur<\/li>\n                                                                                                                    <li>Retaining Wall<\/li>\n                                                                                                            <\/ul>\n                                                                                                <h4 class=\"featured-button__title\">Rail Spur GCS\u00ae Walls<\/h4>\n                                                <button class=\"featured-button__cta\">View Project<\/button>\n                                            <\/div>\n                                        <\/a>\n                                    <\/div>\n                                                            <\/div>\n                                            <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n<!-- End Block: acf\/featured-projects -->\n\n<!-- Start Block: acf\/image-icon-buttons -->\n    <section class=\"image-icons-button inner-image-icons-button\">\n        <div class=\"container\">\n                            <div class=\"row\">\n                    <div class=\"col-lg-10 col-lg-offset-1\">\n                        <div class=\"image-icons-button__headline text-center\">\n                            <h2>Industries We Serve<\/h2>\n                        <\/div>\n                    <\/div>\n                <\/div>\n            \n                            <div class=\"row js-image-icons-button fx-slider\">\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/commercial\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"591\" height=\"443\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Walmart-1.jpg\" class=\"object-fit\" alt=\"Wall project Canada\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Walmart-1.jpg 591w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Walmart-1-300x225.jpg 300w\" sizes=\"(max-width: 591px) 100vw, 591px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-building\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">COMMERCIAL<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/communication\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Communication-Market-1.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Communication-Market-1.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Communication-Market-1-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Communication-Market-1-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-phone\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">COMMUNICATION<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/mining\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Mining-5_1-1.jpg\" class=\"object-fit\" alt=\"Mining\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Mining-5_1-1.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Mining-5_1-1-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Mining-5_1-1-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-mine\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">MINING<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/pipeline\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"750\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation.jpg 1500w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation-300x150.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation-1024x512.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation-768x384.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Oil-and-Gas-Geohazard-Mitigation-1200x600.jpg 1200w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-concrete\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">PIPELINE<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"844\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors.jpg 1500w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors-300x169.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors-1024x576.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors-768x432.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/gsi-sectors-1066x600.jpg 1066w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-rail\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">RAILWAY<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/power\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"1125\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide.jpg 1500w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide-300x225.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide-1024x768.jpg 1024w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide-768x576.jpg 768w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/11\/Stabilize-tower-foundations-from-landslide-800x600.jpg 800w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-tower\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">POWER<\/h4>\n                            <\/a>\n                        <\/div>\n                                                                    <div class=\"col-sm-4 col-lg-2 image-icons-item fx-slide\">\n                            <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/transportation\/\" target=\"\" class=\"image-icons\">\n                                <div class=\"image-icons__img\">\n                                    <img decoding=\"async\" width=\"1000\" height=\"508\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Transportation-Market.jpg\" class=\"object-fit\" alt=\"\" srcset=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Transportation-Market.jpg 1000w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Transportation-Market-300x152.jpg 300w, https:\/\/www.geostabilization.com\/ca\/wp-content\/uploads\/sites\/5\/2023\/12\/Transportation-Market-768x390.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>                                                                                                                        <div class=\"image-icons__img__wrap\"><i class=\"icon-road\"><\/i><\/div>\n                                                                                                            <\/div>\n                                <h4 class=\"image-icons__title\">TRANSPORTATION<\/h4>\n                            <\/a>\n                        <\/div>\n                                    <\/div>\n                                        <div class=\"image-icons-button__bttn text-center\">\n                    <a href=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/\" title=\"Learn more about the industries we serve\" class=\"btn btn-primary\" >Learn more about the industries we serve<\/a>                <\/div>\n                    <\/div>\n    <\/section>\n\n<!-- End Block: acf\/image-icon-buttons -->\n\n<!-- Start Block: acf\/cta-form -->\n    <section class=\"form-text section-padding bg-color-default\" id=\"contact-form\">\n      \n        <div class=\"container\">\n            <div class=\"form-text__flex\">\n                <div class=\"form-text__text\">\n                    <h4>GET IN TOUCH<\/h4>\n<h2>Ready to Get Started?<\/h2>\n<p><span style=\"font-weight: 400;\">If your railway corridor is affected by settlement, slope instability, bridge abutment concerns, or recurring maintenance issues, connect with our Canadian team to discuss corridor conditions and explore stabilization strategies aligned with safety, reliability, and long-term performance.<\/span><\/p>\n<p><a class=\"btn btn-secondary\" href=\"tel:8555790536\">855.579.0536<\/a><\/p>\n                <\/div>\n                <div class=\"form-text__form\">\n                    <div class=\"bg-box\">\n                    <\/div>\n                    <div class=\"form-text__form-wrap\">\n                        \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f9-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"9\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/ca\/wp-json\/wp\/v2\/pages\/181#wpcf7-f9-o1\" method=\"post\" class=\"wpcf7-form init cf7mls-no-scroll cf7mls-auto-return-first-step cf7mls-no-moving-animation\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"9\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.0.6\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f9-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"fieldset-cf7mls-wrapper\" data-transition-effects><fieldset class=\"fieldset-cf7mls cf7mls_current_fs\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li class=\"active\"><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>First Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"first-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter first name\" value=\"\" type=\"text\" name=\"first-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Last Name <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"last-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Enter last name\" value=\"\" type=\"text\" name=\"last-name\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How Can We Help You? <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"iwantto\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"iwantto\"><option value=\"\">I want to... *<\/option><option value=\"Schedule a site visit\">Schedule a site visit<\/option><option value=\"Request a proposal\">Request a proposal<\/option><option value=\"Receive technical information\">Receive technical information<\/option><\/select><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n\n    <center><h5>***Fees May Apply For Residential Site Visits***<\/h5><\/center>\n    \n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-1\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n\n    <div class=\"row\">\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Email <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"email\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Phone <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"phone\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Company <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"company\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-6\">\n            <div class=\"form-col\">\n                <label>Title <sup>*<\/sup><\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"designation\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"designation\" \/><\/span>\n            <\/div>\n        <\/div>\n    <\/div>\n    \n<\/div><div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-2\">Back<\/button><button type=\"button\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-2\">Next<img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/div><p><\/p><\/fieldset><fieldset class=\"fieldset-cf7mls\"><div class=\"form-text__top\">\n    <h3>How Can We Help?<\/h3>\n    <ul class=\"form-step-headers\">\n        <li ><span class=\"text-number\">Personal Info<\/span><\/li>\n        <li ><span class=\"text-number\">Contact Info<\/span><\/li>\n        <li class=\"active\"><span class=\"text-number\">Project Info<\/span><\/li>\n    <\/ul>\n<\/div>\n<div class=\"form-text__middle\">\n    <div class=\"row\">\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>State\/Province <sup>*<\/sup><\/label>\n                <span class=\"wpcf7-form-control-wrap\" data-name=\"state_province\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"state_province\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">\n            <div class=\"form-col\">\n                <label>How can we help? <\/label>\n                    <span class=\"wpcf7-form-control-wrap\" data-name=\"how_can_we_help\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"how_can_we_help\" \/><\/span>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\"> \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <p>By using this website, you acknowledge and agree to our <a href=\"\/privacy-policy\/\" target=\"_blank\">Privacy Policy<\/a>. This site is protected by reCAPTCHA, and the Google <a href=\"https:\/\/policies.google.com\/privacy?hl=en-US\" target=\"_blank\">Privacy Policy<\/a> and <a href=\"https:\/\/policies.google.com\/terms?hl=en-US\" target=\"_blank\">Terms of Service<\/a> apply.<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"col-sm-12\">                  \n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"display: flex; justify-content: center;\">\n                <span class=\"wpcf7-form-control-wrap recaptcha\" data-name=\"recaptcha\"><span data-sitekey=\"6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" class=\"wpcf7-form-control wpcf7-recaptcha g-recaptcha\"><\/span>\r\n<noscript>\r\n\t<div class=\"grecaptcha-noscript\">\r\n\t\t<iframe src=\"https:\/\/www.google.com\/recaptcha\/api\/fallback?k=6LdfGSorAAAAABPm7bJvUFJWqTXCEWggE2toGlSK\" frameborder=\"0\" scrolling=\"no\" width=\"310\" height=\"430\">\r\n\t\t<\/iframe>\r\n\t\t<textarea name=\"g-recaptcha-response\" rows=\"3\" cols=\"40\" placeholder=\"reCaptcha Response Here\">\r\n\t\t<\/textarea>\r\n\t<\/div>\r\n<\/noscript>\r\n<\/span>\n            <\/div>\n            <div class=\"form-col-buttom form-col-btn text-center\" style=\"padding-right: 0px;\">\n                <button type=\"submit\" class=\"btn btn-primary button-submit\">Submit<\/button>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/div>\n<div class=\"cf7mls-btns\"><button type=\"button\" class=\"cf7mls_back action-button\" name=\"cf7mls_back\" id=\"cf7mls-back-btn-cf7mls_step-3\">Back<\/button><button type=\"button\" style=\"display: none;\" class=\"cf7mls_next cf7mls_btn action-button\" name=\"cf7mls_next\" id=\"cf7mls-next-btn-cf7mls_step-3\"><img decoding=\"async\" src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" alt=\"Step Loading\" data-lazy-src=\"https:\/\/www.geostabilization.com\/ca\/wp-content\/plugins\/cf7-multi-step\/assets\/frontend\/img\/loader.svg\" style=\"display: none;\" \/><\/button><\/fieldset><\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n                    <\/div> \n                <\/div>\n            <\/div>\n        <\/div>\n        \n    <\/section>\n\n\n<!-- End Block: acf\/cta-form -->","protected":false},"excerpt":{"rendered":"<p>Railway Geohazard Mitigation &amp; Railroad Engineering What is Railroad Track and Soil Stabilization? One of the most critical railway geohazard mitigation &amp; Geotechnical Engineering Solutions GSI provides is Railroad Track and Soil Stabilization. Railroad soil stabilization refers to the process of strengthening the ground or subgrade beneath a railroad track to ensure its stability and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":176,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-181","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Railway Geohazard Mitigation &amp; Railroad Engineering<\/title>\n<meta name=\"description\" content=\"Our Railway Geohazard Mitigation services include Railroad Stabilization &amp; Bridge abutments. Learn how we limit track downtime &amp; increase cost savings.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railway Geohazard Mitigation &amp; Railroad Engineering\" \/>\n<meta property=\"og:description\" content=\"Our Railway Geohazard Mitigation services include Railroad Stabilization &amp; Bridge abutments. Learn how we limit track downtime &amp; increase cost savings.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/\" \/>\n<meta property=\"og:site_name\" content=\"Geostabilization International - Canada\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-22T18:04:27+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/\",\"name\":\"Railway Geohazard Mitigation & Railroad Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\"},\"datePublished\":\"2023-11-02T10:26:28+00:00\",\"dateModified\":\"2025-12-22T18:04:27+00:00\",\"description\":\"Our Railway Geohazard Mitigation services include Railroad Stabilization & Bridge abutments. Learn how we limit track downtime & increase cost savings.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Industries Served\",\"item\":\"https:\/\/www.geostabilization.com\/ca\/industries-served\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Railway Geohazard Mitigation &amp; Railroad Engineering\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.geostabilization.com\/ca\/#website\",\"url\":\"https:\/\/www.geostabilization.com\/ca\/\",\"name\":\"Geostabilization International - Canada\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Railway Geohazard Mitigation & Railroad Engineering","description":"Our Railway Geohazard Mitigation services include Railroad Stabilization & Bridge abutments. Learn how we limit track downtime & increase cost savings.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Railway Geohazard Mitigation & Railroad Engineering","og_description":"Our Railway Geohazard Mitigation services include Railroad Stabilization & Bridge abutments. Learn how we limit track downtime & increase cost savings.","og_url":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/","og_site_name":"Geostabilization International - Canada","article_modified_time":"2025-12-22T18:04:27+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/","url":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/","name":"Railway Geohazard Mitigation & Railroad Engineering","isPartOf":{"@id":"https:\/\/www.geostabilization.com\/ca\/#website"},"datePublished":"2023-11-02T10:26:28+00:00","dateModified":"2025-12-22T18:04:27+00:00","description":"Our Railway Geohazard Mitigation services include Railroad Stabilization & Bridge abutments. Learn how we limit track downtime & increase cost savings.","breadcrumb":{"@id":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.geostabilization.com\/ca\/industries-served\/railway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.geostabilization.com\/ca\/"},{"@type":"ListItem","position":2,"name":"Industries Served","item":"https:\/\/www.geostabilization.com\/ca\/industries-served\/"},{"@type":"ListItem","position":3,"name":"Railway Geohazard Mitigation &amp; Railroad Engineering"}]},{"@type":"WebSite","@id":"https:\/\/www.geostabilization.com\/ca\/#website","url":"https:\/\/www.geostabilization.com\/ca\/","name":"Geostabilization International - Canada","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.geostabilization.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/comments?post=181"}],"version-history":[{"count":18,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/181\/revisions"}],"predecessor-version":[{"id":16947,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/181\/revisions\/16947"}],"up":[{"embeddable":true,"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/pages\/176"}],"wp:attachment":[{"href":"https:\/\/www.geostabilization.com\/ca\/wp-json\/wp\/v2\/media?parent=181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}