GeoStabilization International® has transformed bridge construction with GSIBRIDGE™ , bridge construction utilizing ™ Geosynthetically Conned Soil™ (GCS™) services that accelerates construction to a fraction of the time when compared to traditional construction methods. Once the existing superstructure is properly removed, new bridge abutments are constructed on each bank; often well away from the stream below. A prefabricated or constructed in-place bridge superstructure is then affixed to the abutments and the GSIBRIDGE™ is ready for traffic.
This approach saves huge sums of money, reduces fabrication time to a fraction, and avoids lengthy and uncertain permitting. Let us show you how GeoStabilization can save you money and time.
If you are interested in a no-obligation site visit to determine if our services fit your geohazard mitigation needs, call us at 855.905.2460 or fill out our contact form.