GSIBRIDGE™

GSIBRIDGE™

GeoStabilization International® has transformed bridge construction with Geosynthetically Confined Soil (GCS) services that allows for single-span bridge construction to happen in a fraction of the time when compared to traditional fabrication methods. Once the existing structure is properly removed, new bridge abutments are constructed on each bank; often well away from the stream below. A prefabricated or constructed in-place bridge deck is then affixed to the abutments and the GSIBRIDGE is ready for traffic.

This approach saves huge sums of money, reduces fabrication time to a fraction, and avoids lengthy and uncertain permitting. Contact Mike Close, our Bridge Specialist, for more information. Let us show you how GeoStabilization can save you money and time!

Before and After

Wooden bridge supporting structure replaced with GSIAbutments and steel deck.

Before and After

Wooden piling bridge replaced with steel beam frame resting on GSIAbutments. Bridge deck is fabricated atop the truss beams.

Closeup of GSIAbutments and bridge deck interface