Roadway Repair using GCS Services

Roadway Repair using GCS™ Services

GeoStabilization International® utilized a Design/Construct/Warranty approach to construct a 28 ft. tall wall with Geosynthetically Confined Soil (GCS) services that was supported on micropiles with final paving and guiderail improvements. The state Department of Transportation was very satisfied with the results and the roadway was opened to the public within 30 days of GeoStabilization being authorized to design and construct the permanent site repairs.