|
|||||||||||||||||||||||||||||||||||||||||||
|
Permanent Stabilization: Soil Nailing |
|
|
|
|
|
Permanent
Stabilization Lots 11 and 12, East Meadows, Vail, Colorado |
Permanent
Soil Nailing and Shotcrete Excavation
Contractor: All Terrain Excavating |
|
|
|
|
Soil Nails
and Shotcrete Lot 331 in Telluride Mountain Village Telluride, Colorado |
Soil Nails
and Shotcrete with Micropiles Utilizing precast concrete lids to create a cut-and-cover tunnel 26-ft wide and 600-ft long on a 12% grade Pine Glades Tunnel Access Jackson Hole,
Wyoming
|