Temporary Shoring: Reticulated Micropiles

Micropile Shoring
Designed by Cameron Lobato, P.E., 2007

General Contractor: Dallas Divide Construction, Telluride, CO


45 LF of micropile shoring, 3 ft from existing structure.

Downtown Telluride, Colorado

Micropile Shoring & Underpinning of Existing House
Designed by Cameron Lobato, P.E., 2007

Temporary micropile shoring and underpinning of existing house to facilitate the addition of a basement.
Limited access was an issue.

327 North Willow Street, Telluride, Colorado

Temporary Reticulated Micropile Shoring
Designed by Cameron Lobato, P.E., 2007

For a new residence

127 South Oak Street

Telluride, Colorado

 

Temporary Reticulated Micropile Shoring with Lifting Pads
Designed by Cameron Lobato, P.E., 2007

For renovation of an historic structure

205 South Oak Street

Telluride, Colorado

 

Temporary Reticulated Micropile Shoring
Designed by Cameron Lobato, P.E., 2007

For construction of a new chapel

Alpine Chapel

Telluride, Colorado

 

 


| Home | Portfolio | About GSI | Media | Contact |